Distribution system is a network of pipelines that distribute water to the consumers. They are designed to adequately satisfy the water requirement for a combination of:
o Domestic
o Commercial
o Industrial
o Fire fighting purposes.

A good distribution system should satisfy the followings:
o Adequate water pressure at the consumer's taps for a specific rate of flow (i.e, pressures should be great enough to adequately meet consumer needs).
o Pressures should be great enough to adequately meet fire fighting needs.
o At the same time, pressures should not be excessive because development of the pressure head brings important cost consideration and as pressure increases leakages increases too.

Note: In tower buildings, it is often necessary to provide booster pumps to elevate the water to upper floors.
o Purity of distributed water should be maintained. This requires distribution system to be completely water-tight.
o Maintenance of the distribution system should be easy and economical.
o Water should remain available during breakdown periods of pipeline. System of distribution should not such that if one pipe bursts, it puts a large area without water. If a particular pipe length is under repair and has been shut down, the water to the population living in the down-stream side of this pipeline should be available from other pipeline.
o During repairs, it should not cause any obstruction to traffic. In other words, the pipelines should not be laid under highways, carriage ways but below foot paths.

Saturday 14 December 2013

SINGLE-LOG

Single-Log

Macamana boleh terjadi
Jika tidak kita yang inginkan
Macamana ianya terjadi
Jika tidak kita yang jadikan

Mungkin  kita sudah terlupa
Yang terkadang kita jadi pelupa
Mungkin juga lupa apa yang terlupa
Yang terlupa mudah menjadi lupa

Apa kita boleh buat
Jika kita terdepan kecemasan
Apa kita akan buat
Jika kita tercemas di depan

Entah apa yang aku fikirkan
Sampai lupa kecemasan di depan
Entah apa yang aku lakukan
Sampai jadi bukan yang ku inginkan

Fakulti Engineering - 1143H

FMEA - what it is?

Type of FMEA
There are three main types of FMEA in use today.
1.    System FMEA: Used to analyze complete systems and/or sub-systems during the concept of design stage.
2.    Design FMEA: Used the analyze a product design before it is released to manufacturing.
3.    Process FMEA:  Used to analyze manufacturing and/or assembly process.
The Process FMEA is probably the most commonly used and is also the least complex, in most cases.

10 steps to creating a FMEA
1.    List the key process steps in the first column.  These may come from the highest ranked items of your C&E matrix.
2.    List the potential failure mode for each process step.  In other words, figure out how this process step or input could go wrong.
3.    List the effects of this failure mode. If the failure mode occurs what does this mean to us and our customer… in short what is the effect?
4.    Rate how severe this effect is with 1 being not severe at all and 10 being extremely severe.  Ensure the team understands and agrees to the scale before you start.  Also, make this ranking system “your own” and don’t bother trying to copy it out of a book.
5.    Identify the causes of the failure mode/effect and rank it as you did the effects in the occurence column.  This time, as the name implies, we are scoring how likely this cause will occur.  So, 1 means it is highly unlikely to ever occur and 10 means we expect it to happen all the time.
6.    Identify the controls in place to detect the issue and rank its effectiveness in the detection column.  Here a score of 1 would mean we have excellent controls and 10 would mean we have no controls or extremely weak controls.  If a SOP is noted here (a weak control in my opinion) you should note the SOP number.
7.    Multiply the severity, occurrence, and detection numbers and store this value in the RPN (risk priority number) column.  This is the key number that will be used to identify where the team should focus first.  If, for example, we had a severity of 10 (very severe), occurrence of 10 (happens all the time), and detection of 10 (cannot detect it) our RPN is 1000.  This means all hands on deck… we have a serious issue!
8.    Sort by RPN number and identify most critical issues.  The team must decide where to focus first.
9.    Assign specific actions with responsible persons.  Also, be sure to include the date for when this action is expected to be complete.
10. Once actions have been completed, re-score the occurrence and detection. In most cases we will not change the severity score unless the customer decides this is not an important issue.



Monolog

Monolog

Terkadang aku menyepi
Bukan kerna aku sendiri
Terkadang aku sendiri
Bukan kerna aku selfi

Acapkali aku mendengar
Acapkali aku terdengar
Kurang sekali jarang dengar
Kurang sekali terlupa dengar

Mungkin aku perlu sendiri
Mungkin juga muhasabah diri
Atau perlu aku kembali
Mencari erti realiti

Thursday 12 December 2013

Prosedur penggubalan undang-undang di Malaysia

Prosedur penggubalan undang-undang di Malaysia

Malaysia mengamalkan sistem Demokrasi Berparlimen di bawah pentadbiran Raja Berperlembagaan dengan Seri Paduka Baginda Yang Di-Pertuan Agong sebagai Ketua Negara. Perlembagaan negara telah digubal dengan mengadakan syarat-syarat untuk pengalaman sistem ini. Salah satu syarat sistem Demokrasi Berparlimen adalah pembahagian kuasa kepada tiga bahagian di dalam pemerintahan, iaitu Perundangan, Kehakiman dan Pentadbiran atau Eksekutif. Di dalam sistem pemerintahan Negera Malaysia, Parlimen memiliki kuasa untuk menggubal undang-undang. Oleh itu Dewan Perundangan Persekutuan ialah Parlimen. Kuasa Perundangan ini diberikan mengikut Perkara 44 Perlembagaan Persekutuan yang terdiri daripada Yang Dipertuan Agong, Dewan Negara dan Dewan Rakyat. Kedua-dua Majlis Parlimen memainkan peranan yang penting dalam proses perundangan.

Di Malaysia sesuatu Rang Undang-undang boleh dikuatkuasakan setelah melalui satu prosedur penggubalan undang-undang. Tugas menggubal undang-undang yang terletak pada badan perundangan meliputi tugas untuk meminda perlembagaan, meluluskan undang-undang baru, memansuhkan undang-undang lama dan baru serta mengesahkan undang-undang yang sedang berjalan. Kesemua proses ini berlaku dalam badan perundangan mengikut prosedur perundangan yang ditetapkan dimana Yang Dipertuan Agong akan memperkenankan Rang-Undang-undang tersebut setelah dibentang dan dibahaskan di Dewan Rakyat dan Dewan Negara . Sebagai peraturan umum, Parlimen berkuasa untuk membuat undang-undang bagi keseluruhan Persekutuan atau mana-mana bahagian. Parlimen Persekutuan mempunyai kuasa perundangan ke atas kebanyakan perkara penting seperti kewangan, perdagangan dan perusahaan, pendidikan, pertahanan dan hal ehwal luar.


DEWAN NEGARA
Dewan Negara adalah komponen kedua dalam Parlimen Malaysia. Ia adalah Majlis Tertinggi atau Senat. Dewan Negara adalah perlu bagi membahaskan sesuatu rang undang-undang dengan lebih halus dan terperinci. Ia juga bertanggungjawab membincangkan perkara-perkara yang menjadi kepentingan umum. Mengikut Perlembagaan Persekutuan Perkara 45, keanggotaan ahli Dewan Negara terdiri daripada seramai 70 orang ahli. Ahli Dewan Negara juga dipanggil Senator. 



DEWAN RAKYAT
Dewan Rakyat adalah komponen ketiga dalam Parlimen Malaysia. Ia merupakan satu majlis khas untuk rakyat menyuarakan hasrat dan pendapat serta mendapatkan pembelaan menerusi wakil-wakil rakyat mereka. Kesemua Ahli Dewan Rakyat dipilih menerusi Piliharaya. Setiap ahli akan mewakili satu kawasan pilihanraya iaitu kawasan pilhanraya Dewan Rakyat. Ahli Dewan Rakyat tidak boleh mewakili dua kawasan Dewan Rakyat atau menjadi ahli Dewan Negara dan ahli Dewan Rakyat dalam tempoh atau yang sama, atau menjadi Ahli Dewan Negara mewakili dua negeri atau menjadi ahli Dewan Negara secara perlantikan dan pilihan di dalm negeri di dalam tempoh waktu yang sama. 


PERSIDANGAN DEWAN 
Parlimen akan bersidang apabila dipanggil oleh Yang Dipertuan Agong. Ia tidak boleh dibiarkan selama enam bulan berselang di antara mesyuarat akhir bagi satu penggal dengan mesyuarat bagi penggal yang akan datang. Parlimen akan kekal untuk lima tahun daripada nya yang pertama. Apabila genap lima tahun, Parlimen akan bubar dengan sendirinya melainkan sebelum cukup tempuh ia dibubarkan oleh Yang Dipertuan Agong. Setelah Parlimen dibubarkan, pilihanraya umum akan diadakan dal tempoh 60 hari dari tarikh pembubaran bagi Semenanjung dan 90 hari bagi Sabah dan Sarawak. Parlimen hendaklah dipanggil bersidang tidak lewat 120 hari selepas tarikh pembubarannya.


Semua mesyuarat Parlimen disusun di dalam satu kalendar yang dinamakan Takwim Parlimen. Kalendar ini dibahagikan kepada lima penggal dan setiap penggal mengambil masa selama satu tahun. Parlimen tidak bersidang di sepanjang penggal tetapi mengadakan mesyuarat sebanyak tiga atau empat kali dalm satu penggal. Setiap satu mesyuarat mengambil masa selama dua minggu bagi Dewan Rakyat manakala Dewan Negara pula memakan masa selama satu minggu kecuali mesyuarat belanjawan yang mengambil mnasa selama lima atau enam minggu.

Thursday 5 December 2013

Advanced Water Pressure Management

Advanced Water Pressure Management

Water Loss Reduction through Pressure Management
In 1997, El Nino triggered a serious water crisis in the Malaysian state of Selangor. An estimated 40% of water produced was not invoiced, with leakage estimated at 25% or half a million cubic meters per day. Halving the amount of physical losses would provide sufficient water to serve the equivalent of 1.5 million people and thereby avert a water shortage in Kuala Lumpur. The state government worked closely with a consortium led by a local firm in joint venture with an international operator. The contractor committed itself to reducing NRW (non-revenue water loss) by a specified amount. To date, the project has met with phenomenal success.
 
In Toronto, Canada, 8% of the utility’s water is lost, which is the equivalent of 15 Olympic–sized swimming pools every day (Clarke, Canada). This figure is not unusual and it is likely a lower percentage than most North American cities. On a global basis, it is estimated that 33 billion cubic meters of treated water is lost at an estimated cost of $15 billion US per year. North America seems to be lagging behind in its awareness of this issue but is gradually catching up to the rest of the world.

There are three components of non-revenue water. Physical (real) losses consist of leakage from the system and overflows at the utility’s storage tanks. They are caused by poor operations and maintenance, inadequate leakage control, and poor quality of underground assets. Commercial (apparent) losses are caused by customer meter under-registration and data handling errors as well as various forms of theft. Unbilled authorized consumption includes water used by the utility for operational purposes, water used for fire fighting, and water provided free to certain consumer groups.

Pressure Management Benefits
Leakage Reduction – If you have a leaking garden hose that has a pressure of 60 psi (4 Bar) and then you reduce the pressure to 30 psi (2 Bar), you will lose less water through that leak. The same principle we holds true in water utility’s distribution system. It is a well-known fact that if you decrease pressure within your system, you will reduce water loss. By reducing pressure by 1%, you will reduce leakage rates by 1.15% (variances can apply). The question is by how much are you able to reduce your pressure while maintaining adequate pressure to your customers. The resulting water loss savings relating to main and service lines can be incredible in both volume and cost.

i2o System Monitors and Control
The i2o system monitors and controls water pressure throughout a zone or network, and allows water companies to do two revolutionary things:
a)      Optimize water pressure continuously and automatically to meet agreed customer services levels throughout the network; and
b)      Adjust water pressure levels in any part of your network with a tap of the keyboard from any internet connection.

Advanced pressure management is achieved either by controlling PRVs in water zones or by controlling pumps feeding the network. We call the first PRV Control, and the second Pump Control. Pump Control allows water networks without PRVs (or networks already optimized at the water zone level) to achieve greater benefits from Advanced Pressure Management.

Advances Pressure Control
Pressure management is one of the most cost effective ways to control the amount of water lost in a system. This can implemented without affecting service levels when activated during off peak demand. It can also reduce consumption in networks. A small reduction in pressure can mean a significant reduction in real losses through leaks, a reduction in bursts and the extension of asset life.

Advanced pressure control is a simple cost effective adaption to an existing pressure control valve potentially yielding fantastic results with short payback periods. A simple interface and intelligent control system is able to be configured for Time, Flow or Closed loop control within single or multi feed networks.

Time Control
Pressure in the networks is modulated throughout the day from peak to minimum demand. The calculated profile (1 day or 7 day) based on historic data is tuned to give adequate pressure at the most critical points across the network. Pressure is typically reduced most at night during low demand periods and raised during the day to meet peak flow and overcome network head-loss.

Flow Modulation
Based on historic data a relationship of Pressure V Flow is programmed into the controller where the pressure supplied into the network is enough to overcome the head-losses for any given flow demand. The controller continually measures the flow rate and controls the supply pressure accordingly to ensure adequate pressure at the most critical points within the network. This technique will respond automatically to demand throughout the day.

Advanced pressure management at the PRV integrates hardware and software to optimize the pressure within a zone. The i2o designed this solution with one goal in mind: deliver the required level of water pressure, no more and no less, adapting throughout the day to actual usage and pressure needs. Unlike PRVs alone, which have fixed outlet pressures; our solutions continuously adjust the PRV outlet pressure according to each zone’s specific and current needs. The solution is made possible through the combination of:
1.   The careful monitoring of flow and pressure by i2o’s robust advanced loggers;
2.  Remote and automated control of pressure via the i2o controller and advanced pilot valve;
3.  Software that continuously learns and characteristics of the network, enabling the optimum PRV outlet pressure to be set to meet pressure requirements under all demand conditions, and
4.  An intuitive online user interface where managers can track their zones’ performance, respond to alarms and adjust pressure settings and schedules from their desktop.

In operating, PRV control smoothly and automatically raises and lowers the pressure delivered by the PRV throughout the day. The result: pressures in the zone are kept to a minimum while ensuring that there is adequate pressure for customers at all times, infrastructure is protected, and leakage, burst frequency expenses all drop significantly.

Closed Loop Control
The ultimate in advanced pressure control. This technique can be used on single or multiple feed networks and can deal simultaneously with several critical points, meeting the requirements of each. Advanced pressure controllers are install and commissioned on each PRV and remote control data logger installed at the critical points. A target pressure or pressure profile is determined at the critical points. Using the GSM network as a communications medium, control messages are sent from the critical point to the controllers adjusting the supply pressure to ensure optimized pressure all the time.

Balancing the supplies on multi-feed networks is possible, as is remote communications to change target pressure at any time or manual system control.

Example Of Risk Assessment Report

Example Of Risk Assessment Report

1.0 Introduction
a)      Facility setting and operational history;
b)      Objectives and scope; and
c)      Approaches and methodology.
2.0 Contaminants And Areas Of Concern
a)      Site data review and screening;
b)      Chemicals of potential concern; and
c)       Subareas or unit of interest.
3.0 Toxicity Or Dose Response Assessment
a)      Land use and exposure reaction; and
b)      Toxicity data for chemical concerns.
4          4.0 Exposure Assessment
a)      Land use and exposure response;
b)      Exposure pathways and potential receptors; and
c)      Exposure quantification.
5          5.0 Health Risk Characterization
a)      Cancer and non-cancer risks;
b)      Major contributor of risks; and
c)      Population risks and public health.
6          6.0 Safety Risk Screening
a)      Hazardous material; and
b)      Hazardous structure and conditions.
7          7.0 Public Welfare
a)      Restriction on public resource use; and
b)      Nuisance condition.
8          8.0 Uncertainty And Sensitivity Analysis
9          9.0 Preliminary Risk Management Goals
1          10.0 References
       11.0 Appendixes

Risk Assessment

1Risk Assessment
Risk assessment can be defined as the process of estimating the probability of occurrence of an event and the probable magnitude of adverse effect-safety, health, ecological or financial – over a specified time period (Rao V. Kolluru). Risk assessment can be divide into five (5) points which are safety risk, health risk, ecological risk, public welfare risk and financial risks which with this point it can help people to measure risk. Anyway, there are several risk assessment paradigm and models that are always using in studies which are (a) American Model; and (b) Canadian Model.

1Risk Assessment Application
Risk assessment can be applied in a variety of situations, for examples :
a)      Assess the benefits and cost of existing and proposed regulations;
b)      Assess benefit versus risks of new drug;
c)      Appraise benefit versus risks of pesticide use;
d)     Conduct baseline analysis of a site or facitlity to determine the need for remedial action and the extent of clean up required;
e)      Develop clean up goals for contaminants where the numerical standards have not been promulgated and to set priorities for corrective action;
f)       Develop a scientific frame work for closing down or decommisioning facilities;
g)      Provide a scientific basis for a corporate risk reduction and management programme.

Risk Assesement Advantages
There are several risk assesment advantages which are :
a)      “bottom line” public health and safety concerns addressed with a common language;
b)      Systematic framework for priotizing problems, allocating resources and avoiding  future problems;
c)      Scientific underpinnings for risk management.

 Risk Assessment Limitation
a)      No broad consensus on the purpose, the approach or the results; inadequate data, speculative and myopic nature of assumption;
b)      Few qualified professional with needed range of skills; risk assessors, engineers and economists talk different language;
Multiple events, diverse intense, unrealistic expectations, credibility problems.